Tube Track Instructions
by knexknexknexknex in Living > LEGO & K'NEX
959 Views, 1 Favorites, 0 Comments
Tube Track Instructions
This will tell you how to make Tube Track.
Get the pieces as you go.
Get the pieces as you go.
Base
You need 4 red axles, 40 four way connecters with slot, 40 seven way connectors with slot, 39 yellow axles.
Track
You need 19 five way connectors and four way connectors with slot, 3 small axles and seven way connectors with slot, 25 yellow axles, 1 red axle, 1 two straight way connector, 1 green four way connector, 1 red connector, 12 white axles, 2 end connectors and snowflake connectors, 6 blue/purple axles.
Attaching the Track
The Lift
You will build the lift in this step.
Top Track
You need 29 yellow axles, 8 four way connectors with slot, 10 seven way connectors with slot, 4 small axles and red connectors, 2 blue/purple axles
The Towers
You will need 53 yellow axles, 52 four way connectors with slot, 2 seven way connetors with slot
Top Track
You need 2 "Y" connectors, 2 red connectors, 2 small axles, 6 five way connectors with tab, 3 yellow axles.
Beginning Track
You need 3 red connectors, 3 small axles, 2 end connectors, 1 seven way connector with slot, 1 green four way connector, 6 five way connectors with tab, 7 yellow axles
4 BLUE/PURPLE AXLES. I FORGOT TO INCLUDE!
4 BLUE/PURPLE AXLES. I FORGOT TO INCLUDE!
The Curve
You need 22 five way connectors with tab, 20 small axles, 11 blue/purple axles, 10 "Y" connectors
Sides
Tubing
Attaching the tubing. You`re done! Now do what you want with it.