% O0001(NAME OF OPERATION) G90 Z1 (Absolute positioning, Z safety move up) G17 G20 M05( XY Plane, Inches, Spindle Off) S? M03 (Spindle On) G00 X0 Y0 (Move to XY Zero) G00 X.5 Y.5 F?(Move to position 1 with feed rate) G1 G91 X-.125 Y-.125 G90 Z-.2 G91 (BOTTOM) X1.375 Y-.2 X1.5 Y.2 X1.25 Y-.2 X1.5 Y.2 X1.375 (SIDE TWO) Y1.275 X-.2 Y.7 X.2 Y1.275 (TOP) X-7 (SIDE ONE) Y-1.275 X.2 Y-.7 X-.2 Y-1.275 G0 Z1 (Z safety move up) G90 X0 Y0 (Return to Zero) M30 (End Program) %